- Messages : 2
- Remerciements reçus 0
"Edit Track" window date bug
- psorowka
- Auteur du sujet
- Hors Ligne
- Nouveau membre
-
Moins
Plus d'informations
il y a 2 jours 9 heures #3264
par psorowka
"Edit Track" window date bug a été créé par psorowka
Hi,
I noticed a bug when editing dates in the "Edit Track" window. My situation is the following:
- I have recorded a track starting on July 31 and ending on August 23
- I want to split the track in two separate tracks
- For this, I duplicate the track and want to cut off the first or second part respectively, e.g. Track 1: July 31 -> August 14, Track 2: August 15 - August 23
- This works as expected for Track 1, I can just change the end date to August 14 and Save, track is shortened as expected
- for Track 2 however, I have a problem. When I try to edit the "Start Date" of the Track, qtVlm does not let me do it, supposedly because it validates the input on every single character change. E.g. when I try to change "31" to "23", it doesn't allow it because July 23 is not part of the track. Vice versa, when I try to change July to August, it doesn't allow the change, I assume because August 31 would mean "start date after end date"
There is a workaround, copy&paste the full date, edit it externally and paste a full edited date back.
But I assume this is a bug; noticed it in 5.2.17-p2 under Linux.
I noticed a bug when editing dates in the "Edit Track" window. My situation is the following:
- I have recorded a track starting on July 31 and ending on August 23
- I want to split the track in two separate tracks
- For this, I duplicate the track and want to cut off the first or second part respectively, e.g. Track 1: July 31 -> August 14, Track 2: August 15 - August 23
- This works as expected for Track 1, I can just change the end date to August 14 and Save, track is shortened as expected
- for Track 2 however, I have a problem. When I try to edit the "Start Date" of the Track, qtVlm does not let me do it, supposedly because it validates the input on every single character change. E.g. when I try to change "31" to "23", it doesn't allow it because July 23 is not part of the track. Vice versa, when I try to change July to August, it doesn't allow the change, I assume because August 31 would mean "start date after end date"
There is a workaround, copy&paste the full date, edit it externally and paste a full edited date back.
But I assume this is a bug; noticed it in 5.2.17-p2 under Linux.
Connexion ou Créer un compte pour participer à la conversation.
- maitai
- Hors Ligne
- Administrateur
-
Moins
Plus d'informations
- Messages : 974
- Remerciements reçus 2
il y a 2 jours 8 heures #3265
par maitai
Réponse de maitai sur le sujet "Edit Track" window date bug
Thanks for reporting that, it will be fixed in next release
Connexion ou Créer un compte pour participer à la conversation.
- psorowka
- Auteur du sujet
- Hors Ligne
- Nouveau membre
-
Moins
Plus d'informations
- Messages : 2
- Remerciements reçus 0
il y a 2 jours 6 heures #3266
par psorowka
Réponse de psorowka sur le sujet "Edit Track" window date bug
Cool, thanks for the quick reply! For a fix, I think the continuous input validation for a valid date does make sense.
My favorite "expected behavior" would be a roll-over for the different date components when using the arrows in the field. E.g. to stick with above example: click on July 31 and then hit "arrow up" and land at "August 1" next.
I would personally not allow any non-valid input because this will cause frustration when a user messes up the date format which is easily done.
My favorite "expected behavior" would be a roll-over for the different date components when using the arrows in the field. E.g. to stick with above example: click on July 31 and then hit "arrow up" and land at "August 1" next.
I would personally not allow any non-valid input because this will cause frustration when a user messes up the date format which is easily done.
Connexion ou Créer un compte pour participer à la conversation.
- maitai
- Hors Ligne
- Administrateur
-
Moins
Plus d'informations
- Messages : 974
- Remerciements reçus 2
il y a 2 jours 6 heures #3267
par maitai
Réponse de maitai sur le sujet "Edit Track" window date bug
No worries, the control is now made when you press OK, and you will get a message if the new starting date is before the present one, or if the new ending date is after the present one
Connexion ou Créer un compte pour participer à la conversation.
Temps de génération de la page : 0.165 secondes